The pattern is familiar by now. A team builds a proof of concept. It works. It goes into a deck, gets shown to leadership, and everyone agrees it is impressive. Six months later nothing is in production and the budget has quietly moved somewhere else.
Almost none of these failures are about model quality. Here is what actually goes wrong, roughly in order of frequency.
Nobody agreed what “working” meant
A demo works if it produces a plausible answer in front of an audience. That is a much lower bar than a system that has to be correct often enough for someone to rely on it.
The fix costs two hours at the start. Before building anything, write down the one number you are trying to move — first-pass resolution rate, average handling time, invoices processed without a human touch — and its current value. Then agree what improvement would justify the spend, and what result would make you walk away. A pilot measured against a number agreed in advance is a project. A pilot measured against a feeling is a demo with a longer runway.
The demo data was not your data
Proofs of concept are usually built on a tidy sample: a few hundred well-formatted documents, or a spreadsheet someone curated. Production is thousands of files scanned badly, in three languages, with a decade of inconsistent conventions baked in.
Retrieval quality collapses first. The model is rarely the bottleneck — the search over your documents is, and that only shows up when it meets the real corpus. Which means the highest-value thing to fix is often the boring one: converting documents, cleaning metadata, and making the source findable.
No one owned it after the workshop
Pilots that die often had a sponsor and no owner. A sponsor approves the budget. An owner is the person whose Tuesday gets worse if the system stops working.
If no such person exists, the pilot has no route into production, because nothing changes about how work is done without someone whose job depends on it changing. Find the owner before the build, not after.
Evaluation was skipped
Most pilots have no test set, so there is no way to answer “is this good enough?” other than asking the people who built it. That is not a defensible answer in front of an auditor, a regulator, or a procurement review — and it means the system cannot be improved either, because there is no baseline to compare against.
The security review happened last
The model sees data. Someone has to sign off on that. When the review happens at the end, it frequently ends the project: the design assumed access it cannot have, or the third-party endpoint cannot be used at all.
Run the review in week one, against the proposed architecture, before anything is built. It is much cheaper to change a design than a system.
What a pilot that survives looks like
The ones that reach production look unremarkable:
- One process, not a platform.
- A baseline number, agreed before the build, on real data.
- A named owner from the business side.
- A test set drawn from real historical cases, including the awkward ones.
- Go/no-go gates every two weeks, with the honest option to stop.
- A security and data-residency decision made in week one.
None of that is exciting, which is rather the point. The exciting part — whether the model can do the task at all — is usually settled quickly. Everything afterwards is the work of turning a demonstration into something a business can depend on.